Operationally available capacity for May 2024.
T North
26" Alberta West Capacity
April 29 - May 3, 2024: 0 GJ
Facilities on the Alberta Mainline East of CS1 will be allowed to flow to Gordondale (MS 134,165,185,198,162,161, and 199). Dry Gas Over Production Charges will be in effect.
No Eastbound flows to Gordondale from Fort Nelson Mainline and Fort St. John Mainline (Includes MS 204 Taylor T-North).
A full isolation is required for MS 84 Flatrock Creek for the duration of the outage.
Aitken Creek Lateral Capacity
May 6 - 15, 2024: 0 GJ
Nomination offsets will be authorized above the capacity based on Aitken Storage injection authorizations.
Production on the Aitken Lateral may be limited by storage authorizations.
Dry Gas Over Production Charges will be in effect.
Sunset Creek Interconnect Capacity
May 4 - 10, 2024: 0 GJ
May 11 - 13, 2024: 837,258 GJ
T South
Please see attached the T-South estimated operationally available capacities for May 2024.
These capacities are to be used in conjunction with the Weekly Outage Schedule. A critical notice will be published on the Customer Interface (C.I.) closer to the time of the scheduled work to confirm the capacities.
If you have any questions, please contact the CSR hotline at (403) 699-1800.
|