Westcoast Energy Inc.

Critical Notice

Pipeline Operational Status

 

Notice:

 #56523

Revision: 

 #0

 

Subject:

Pipeline Operational Status for February 1, 2023 16:00 CCT

 

Summary:

       

System Linepack at 15:20 CCT:

3,381

  MMCF

 

Change Since Start of Gas Day February 01, 2023:

12

  MMCF

 

Target Linepack for Gas Day February 01, 2023:

3,200

  MMCF

 
 

System Status at Report Time:

High LinepackOn Target Linepack

System-Wide OFO in Effect:

No

Pack Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 8%

Non-Suppliers:

Minimum 500 GJ - Maximum of 2% up to 5,000 GJ

Marketers:

Mandatory zero balance

Draft Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 8%

Non-Suppliers:

Minimum 500 GJ - Maximum of 2% up to 5,000 GJ

Marketers:

Mandatory zero balance

 

Physical Operations Notes:

The Stop Light remains Red due to an unplanned Pipeline Isolation in T-South. Linepack is high as a result and expected to decrease today.

 
 

Operational Status Details:

 

Report for Gas Day

 

Forecast for Gas Day

 

February 01, 2023

 

February 02, 2023

No details available for this Operational Status.

 

Pipeline Status:

Mainline North

Mainline Central

Mainline South

 

Commercial Notes:

Packed Shippers must ensure accounts are within tolerance.

 

Estimated Imbalances at the end of Gas Day January 31, 2023:

Total Shipper Imbalances(GJ)

684,241

Total OBA Imbalances(GJ)

-383,176

System Gas on Pipe(GJ)

-26,946

 

A negative imbalance is owed to the Pipeline.

 

The above information is a forecast based on variable factors and as a result can change once actual data is validated.

If you have any questions, please call the CSR hotline at (403) 699-1800

 
Posting Date:01-Feb-2023 16:06 CCT
Effective Date:01-Feb-2023
End Date:01-Feb-2023
Response Date:N/A
Location:N/A
Contacts:N/A