Westcoast Energy Inc.

Critical Notice

Pipeline Operational Status

 

Notice:

 #56042

Revision: 

 #0

 

Subject:

Pipeline Operational Status for August 3, 2022 16:00 CCT

 

Summary:

       

System Linepack at 15:50 CCT:

3,338

  MMCF

 

Change Since Start of Gas Day August 03, 2022:

-56

  MMCF

 

Target Linepack for Gas Day August 03, 2022:

2,950

  MMCF

 
 

System Status at Report Time:

High LinepackHigh Linepack

System-Wide OFO in Effect:

No

Pack Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 8%

Non-Suppliers:

Minimum 500 GJ - Maximum of 2% up to 5,000 GJ

Marketers:

Mandatory zero balance

Draft Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 8%

Non-Suppliers:

Minimum 500 GJ - Maximum of 2% up to 5,000 GJ

Marketers:

Mandatory zero balance

 

Physical Operations Notes:

Linepack is expected to decrease today but remains unhealthy. Planned maintenance in T-South is resulting in High Linepack in T-North.

 
 

Operational Status Details:

 

Report for Gas Day

 

Forecast for Gas Day

 

August 03, 2022

 

August 04, 2022

No details available for this Operational Status.

 

Pipeline Status:

Mainline North

Mainline Central

Mainline South

 

Commercial Notes:

Packed Shippers must ensure accounts are within tolerance.

 

Estimated Imbalances at the end of Gas Day August 02, 2022:

Total Shipper Imbalances(GJ)

255,594

Total OBA Imbalances(GJ)

18,597

System Gas on Pipe(GJ)

-83,866

 

A negative imbalance is owed to the Pipeline.

 

The above information is a forecast based on variable factors and as a result can change once actual data is validated.

If you have any questions, please call the CSR hotline at (403) 699-1800

 
Posting Date:03-Aug-2022 16:05 CCT
Effective Date:03-Aug-2022
End Date:03-Aug-2022
Response Date:N/A
Location:N/A
Contacts:N/A