Westcoast Energy Inc.

Critical Notice

Pipeline Operational Status

 

Notice:

 #55398

Revision: 

 #0

 

Subject:

Pipeline Operational Status for January 4, 2022 16:00 CCT

 

Summary:

       

System Linepack at 15:05 CCT:

2,800

  MMCF

 

Change Since Start of Gas Day January 04, 2022:

-50

  MMCF

 

Target Linepack for Gas Day January 04, 2022:

3,100

  MMCF

 
 

System Status at Report Time:

Low LinepackLow Linepack

System-Wide OFO in Effect:

No

Pack Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 8%

Non-Suppliers:

Minimum 500 GJ - Maximum of 2% up to 5,000 GJ

Marketers:

Mandatory zero balance

Draft Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 8%

Non-Suppliers:

Minimum 500 GJ - Maximum of 2% up to 5,000 GJ

Marketers:

Mandatory zero balance

 

Physical Operations Notes:

Linepack is at an unhealthy Low level and is expected to increase today.

 
 

Operational Status Details:

 

Report for Gas Day

 

Forecast for Gas Day

 

January 04, 2022

 

January 05, 2022

No details available for this Operational Status.

 

Pipeline Status:

Mainline North

Mainline Central

Mainline South

 

Commercial Notes:

Drafted shippers must ensure accounts are within tolerance.

 

Estimated Imbalances at the end of Gas Day January 03, 2022:

Total Shipper Imbalances(GJ)

-247,444

Total OBA Imbalances(GJ)

228,201

System Gas on Pipe(GJ)

38,510

 

A negative imbalance is owed to the Pipeline.

 

The above information is a forecast based on variable factors and as a result can change once actual data is validated.

If you have any questions, please call the CSR hotline at (403) 699-1800

 
Posting Date:04-Jan-2022 16:01 CCT
Effective Date:04-Jan-2022
End Date:04-Jan-2022
Response Date:N/A
Location:N/A
Contacts:N/A