Westcoast Energy Inc.

Critical Notice

Pipeline Operational Status

 

Notice:

 #55243

Revision: 

 #0

 

Subject:

Pipeline Operational Status for November 22, 2021 08:30 CCT

 

Summary:

       

System Linepack at 06:50 CCT:

2,987

  MMCF

 

Change Since Start of Gas Day November 21, 2021:

-59

  MMCF

 

Target Linepack for Gas Day November 21, 2021:

3,100

  MMCF

 
 

System Status at Report Time:

On Target LinepackLow Linepack

System-Wide OFO in Effect:

No

Pack Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 8%

Non-Suppliers:

Minimum 500 GJ - Maximum of 2% up to 5,000 GJ

Marketers:

Mandatory zero balance

Draft Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 8%

Non-Suppliers:

Minimum 500 GJ - Maximum of 2% up to 5,000 GJ

Marketers:

Mandatory zero balance

 

Physical Operations Notes:

The Stoplight remains Red due to unplanned pipe line isolation in T South. Linepack is expected to decrease today.

 
 

Operational Status Details:

 

Report for Gas Day

 

Forecast for Gas Day

 

November 21, 2021

 

November 22, 2021

Total System:

Receipts

(MMCF)

1,991

 

2,216

Deliveries

(MMCF)

1,987

 

2,323

 

Gordondale Alliance:

Estimated Deliveries

(MMCF)

165

 

167

 

Gordondale TCPL:

Estimated Deliveries

(MMCF)

54

 

50

Estimated Receipts

(MMCF)

0

 

0

 

Sunset TCPL:

Estimated Deliveries

(MMCF)

252

 

281

 

Huntingdon:

Estimated Flow Total

(MMCF)

1,388

 

1,674

Estimated Flow Export

(MMCF)

917

 

983

Authorized Business

(MMCF)

1,502

 

1,597

Pressure

(PSI)

648

 

648

 

Pipeline Status:

Mainline North

Mainline Central

Mainline South

 

Commercial Notes:

Shippers must ensure accounts are within tolerance.

 

Preliminary Imbalances at the end of Gas Day November 21, 2021:

Total Shipper Imbalances(GJ)

-391,427

Total OBA Imbalances(GJ)

372,775

System Gas on Pipe(GJ)

-23,578

 

A negative imbalance is owed to the Pipeline.

 

The above information is a forecast based on variable factors and as a result can change once actual data is validated.

If you have any questions, please call the CSR hotline at (403) 699-1800

 
Posting Date:22-Nov-2021 07:41 CCT
Effective Date:22-Nov-2021
End Date:22-Nov-2021
Response Date:N/A
Location:N/A
Contacts:N/A