| | | |
| |
System Linepack at 15:50 CCT: |
3,033 |
MMCF |
|
Change Since Start of Gas Day November 21, 2021: |
-13 |
MMCF |
|
Target Linepack for Gas Day November 21, 2021: |
3,100 |
MMCF |
|
|
System Status at Report Time: |
| On Target Linepack | Low Linepack |
|
|
System-Wide OFO in Effect: | No | Pack Tolerances: | Suppliers: | Minimum 500 GJ - Maximum of 8% | Non-Suppliers: | Minimum 500 GJ - Maximum of 2% up to 5,000 GJ | Marketers: | Mandatory zero balance | Draft Tolerances: | Suppliers: | Minimum 500 GJ - Maximum of 8% | Non-Suppliers: | Minimum 500 GJ - Maximum of 2% up to 5,000 GJ | Marketers: | Mandatory zero balance | |
|
Physical Operations Notes: |
The Stoplight remains Red due to unplanned pipe line isolation in T South. Linepack is expected to decrease today. |
|
|
Operational Status Details: |
|
Report for Gas Day |
|
Forecast for Gas Day |
|
November 21, 2021 |
|
November 22, 2021 |
No details available for this Operational Status. |
|
Pipeline Status: |
|
Mainline North |
|
|
Mainline Central |
|
|
Mainline South |
|
|
Commercial Notes: |
Shippers must ensure accounts are within tolerance. |
|
Estimated Imbalances at the end of Gas Day November 20, 2021: |
Total Shipper Imbalances(GJ) |
-140,958 |
|
Total OBA Imbalances(GJ) |
212,318 |
|
System Gas on Pipe(GJ) |
-23,578 |
|
|
A negative imbalance is owed to the Pipeline. |
|
The above information is a forecast based on variable factors and as a result can
change once actual data is validated.
If you have any questions, please call the CSR hotline at (403) 699-1800
|